Project cargo
When it does not fit the pallet or the flight.
Out-of-gauge pieces, exhibition freight, and site deliveries quoted from drawings and access, not from the online estimate.
Project cargo starts when the piece does not fit the pallet or the flight. Out-of-gauge skids, exhibition freight, and site deliveries are quoted from drawings, weight, photos, and the hour the yard or the venue can receive. The online estimator stops being honest above ordinary pallet weight, and above ten tonnes you should start here rather than on the rate range.
The desk answers with a method, not only a price: which gate, which trailer, whether an escort or a crane is required, and whether a route survey has to happen before a truck is promised. Low bridges, night-only gates, and site inductions change the plan. Send those rules with the first email. A survey is cheaper than a truck that cannot enter.
Exhibition freight is booked backwards from the venue slot. The build-up day and the dismantle day are different bookings if the return is not on the same file. Cranage at the venue is named on the quote. One coordinator stays on the reference from the origin yard to the site, including when the move crosses from the UAE into Saudi Arabia, Qatar, or Oman.
Dangerous contents, even inside a project piece, still need a complete declaration. A drawing does not replace that paper. Duty and any special import licence are called out before the sailing or the trailer is booked. The freight confirmation is not a permit.
What you should expect back is a written transit, the cut-off or the site window, and a price that lists escorts and cranage rather than hiding them. If the lane is not honest for the weight, the quote says so. Indicative website ranges do not apply to this product.
- Route check before the truck is promised
- Cranage, escorts, and permits named on the quote
- A single coordinator from origin yard to site